For technical products and solutions

The First AI Sales Engineering Platform

Upload your RFP and Stazion maps out all the requirements into groups. Where you have answered one before, it shows you how. Four hundred pages, one working list.

TENDER 2026-117 · REQUIREMENTS142 REQUIREMENTS · 5 TEAMS · 4 FILES
RefBuyer requirementOwnerStatus
REQ 3.1.2Enclosure protection rating min. IP65 for washdown areas.EngineeringOleANSWERED BEFOREYou committed to IP66 on two earlier tenders.Offer 2025-84 · sent Mar 2026
REQ 4.1.1Spare parts availability guaranteed 10 years from FAT.ServiceMetteDRAFTEDStandard programme covers 7 years; drafted with the gap flagged.service_terms_2025.pdf · p. 3
REQ 5.2.0Skid capacity 300 m³/h, layout to suit site drawing D-114.EngineeringUnassignedYOUR CALLEngineered for this tender. No answer written, and no compliance claimed.
REQ 2.4.7Technical documentation delivered in English and Danish.Bid teamYouASKEDQuestion sent to Documentation in Teams. One-click reply lands here.
EVERY REQUIREMENT HAS A TEAMNOTHING IS ANSWERED UNTIL YOU SAY WHICH PRODUCT YOU ARE SELLING
§ 01The status quo

A 60-page RFP, answered with Word, Excel, and reply‑all.

Most deals don’t turn on whether you can meet the requirements. They turn onproving it before the deadline. The proof already exists, in your datasheets, test reports, and a few engineers’ heads. Assembling it is still done entirely by hand.

last_proposal_FINAL_v7.docx

Copy-pasted from the bid you sent eight months ago.

compliance_matrix(3).xlsx

Hand-built, row by row, against a 60-page RFP.

RE: RE: FW: RFP questions

47 emails chasing engineers for answers they gave last time.

Replaced by one workspace ↓

§ 02How it works

The whole tender, in front of your team.
Every step in one workspace.

01

Find

Every morning the new public tenders across Europe are read against what you sell, and the few that fit reach your list, each with the tender’s own words behind it.

02

Screen

Before a requirement is read, Stazion says whether the tender fits what you sell, and checks the buyer’s demands on a supplier (turnover, references, certificates) against your own documents.

03

Extract

Upload the whole bundle: the tender, the bill of quantities, the specification, the addenda. Every requirement is pulled out and structured, whether it arrives as a PDF, an Excel sheet, scanned, or in another language.

04

Understand

Each requirement is read on its own terms: what is actually being asked, which team answers it, and what it takes to fulfil it. Decided from the tender text alone.

05

Recall

For each requirement, Stazion finds what you have already said: proposals you actually sent, and your own documentation, with the source. Nobody rewrites an answer the company has already given.

06

Draft

The response takes shape per requirement, with a compliance verdict where one can honestly be given and none where the equipment has yet to be designed. The buyer’s contract terms are compared with your own, term by term.

07

Collaborate

Every requirement already carries the team that answers it, so the work is easy to divide. Assign requirements, @mention colleagues, or ask a teammate by email or in Microsoft Teams; their answers come straight back onto the requirement.

08

Fill in

The buyer’s own spreadsheet, Word form or PDF form is filled in from your accepted answers, each one proposed in its cell for a person to accept. You download a filled copy; the buyer’s original stays as it was.

09

Propose & learn

A proposal draft is written from your answers, in the look of your own past proposal. You send the bid yourself, a new version from the buyer is compared line by line, and every sent answer sharpens the next draft.

Machine output is always a draft. A human approves every change

§ 03The choice

Tell Stazion which product you are selling.
It answers from that, and nothing else.

Before it answers anything technical, you point it at the documents for the product you are quoting. If you are designing the solution for this tender, there are no documents yet, so it drafts from your own material and claims nothing about compliance. Nobody can promise what a design will do before it exists.

THESE FILES

You know which product you are quoting

The usual case for a distributor or reseller quoting a standard product. Stazion answers from the datasheets you pick and nothing else, looks up a specification value where the tender asks for one, and can give each requirement a compliance verdict with a quote to back it.

MY WHOLE LIBRARY

You have not picked a product yet

Requirements are judged against everything in your library rather than one product, for when the configuration is still open.

WE BUILD IT OURSELVESMOST COMMON

You are designing it for this tender

The usual case for a manufacturer, integrator or contractor building to order. There is no datasheet yet, so Stazion drafts each specification from your own material and from how you answered the same thing before, with the sources attached and no compliance verdict. Where you have nothing on file, the line stays empty for your engineer.

Until you choose, nothing gets answered. Rebuild the requirement list and the choice resets

§ 04Evidence

Every answer cites its source.

A drafted response only helps if the person sending it trusts it enough to edit rather than start over. That trust is built one citation at a time.

01

Verbatim, verified quotes

Every verdict carries an exact quote from your own library, checked against the source text. Never a paraphrase.

02

“Not found” instead of a guess

If the evidence isn’t in your documents, the draft says so and flags the requirement for a human, instead of inventing an answer.

03

Reuses what you actually sent

Past answers are recalled only from responses you actually sent, never from old drafts, so it repeats what you stood behind, not something half-written.

04

Numbers stay yours

A price is read from your own product record or entered by your rep. Never invented, and never guessed by a model.

REQ 5.3.1 · DRAFTED ANSWERCOMPLY

“The supplier shall document a mean time between failures (MTBF) of at least 40,000 hours for all drive units.”

Comply. The DRV-550 series is certified at 50,000 hours MTBF under continuous operation, verified in third-party endurance testing. Full test protocol available on request.

DRV550_reliability.pdf · p. 7endurance_cert_2024.pdf · p. 2REUSED · SENT MAR 2026
EVERY SENT RESPONSE MAKES THE NEXT DRAFT SHARPER
§ 05Find tenders
FIND TENDERS · THIS MORNING3 NEW
Circulation pumps for a district heating plant
Heating utility · DenmarkEU-WIDE
12 Nov
New boiler house, mechanical installation
Municipality · GermanyNATIONAL
28 Nov
Renewal of six sewage pumping stations
Water utility · NorwayNATIONAL
3 Dec
Why it was found

The utility is buying the circulation pumps for its new plant, the kind you sell.

IN ENGLISH: “4 circulation pumps, 315 kW, including frequency converters”

ORIGINAL
A FIND ONLY WHERE THE TENDER’S OWN WORDS SAY SO

The tender before anybody sends it to you.

Tell Stazion what you sell, in a buyer’s words. Every morning it reads the new public tenders across Europe and puts the few that fit in front of you, each with a sentence on why and the tender’s own words to back it.

01

Every morning, across Europe

The EU’s tender database and the national portals of Germany, Switzerland, the UK, Norway, Finland and Austria, read every working day, so the smaller tenders below the EU thresholds are in it too.

02

A reason you can check

Each find says in one line why it fits, and rests on the tender’s own words, translated into yours, with the buyer’s original one press away. No quote, no find.

03

Who won before, and who wins this kind of work

The buyer’s earlier contracts for the same work, and the firms that win the most of it in the country: often the contractors who buy your equipment.

04

Straight into an RFx

Start an RFx from a find and the buyer, the deadline and the notice come along, with the tender’s own files where the platform publishes them openly.

Explore the tender finder →
§ 06Drawing takeoff
RFX · DRAWING TAKEOFFCOUNTED
TTTT-101TTTT-102TITLE BLOCK · NOT COUNTED
Ball valve DN50
READ FROM CADBV-050
× 12€ 1,008
Check valve DN80
READ FROM CADCV-080
× 4€ 736
Temperature transmitter
AI ESTIMATEno part no.
× 6€ 1,860 PROPOSED
Pressure gauge
AI ESTIMATEPG-016
× 9€ 423
31 components · 1 proposal waiting€ 2,167
YOUR PRICE LIST OR ERP · A PROPOSAL IS NEVER A PRICE UNTIL ACCEPTED

Count the drawing. Not by hand.

Your engineers send a drawing, and somebody counts every valve, sensor and fitting on it before a price can be put on the bid. Stazion counts them for you, shows each one on the drawing so you can check it, and prices the count from your own price list or straight from your ERP.

01

Counted from the file, or by the AI

A CAD file (DXF) is counted from its own blocks, with the part numbers and sizes your engineer gave them. A PDF or an image is counted by the AI page by page, and every line it was unsure of is marked for a person to look at.

02

Checked on the drawing itself

Press a line and its places light up on the sheet. Take out one that is not a component, add one the count missed, or mark a whole new line by hand.

03

Priced from your price list or your ERP

Each component is looked up by its part number in your own price list, or straight in your ERP for today’s price. A line without one gets a proposed price, which stays out of the total until somebody accepts it.

04

Into the tender, revision by revision

Write the count and its total into the requirement it answers, see what changed per line when the engineer sends a new revision, and download it all to Excel.

Explore drawing takeoff →
§ 07Product Q&A
SALES ENGINEER · PRODUCT Q&ASOURCED
Which of our pumps can run a 3% sand slurry continuously at 40 bar?

The HD-900 series handles abrasive slurries up to 5% solids at a rated discharge pressure of 50 bar, so it covers this duty with margin. The standard HX-400 is limited to clean fluids and is not suitable here.

HD900_datasheet.pdf · p. 6HX400_datasheet.pdf · p. 2
ANSWERED FROM YOUR OWN DATASHEETS · NEVER A GUESS

The knowledge of your best engineer, on demand.

Not every question comes wrapped in an RFP. Reps ask the AI Sales Engineer anything about your products and get an instant, sourced answer, drawn from the same documents your tender responses come from. No waiting in the engineering queue, no guesswork.

01

Instant answers, no engineering queue

Every salesperson asks in plain language and gets a trustworthy answer in seconds, instead of waiting days for an engineer to reply.

02

Every claim cites its source

Each answer points to the exact document and page it came from, so the rep can verify it and quote it with confidence.

03

Compare products and configurations

Ask which model fits a spec, or how two units differ, and get a side-by-side answer drawn straight from your own datasheets.

Explore Product Q&A →
§ 08Fit

Built around the stack you already run.

CHANNEL

Outlook and Teams

Questions to engineering go out by email or in Microsoft Teams, from your rep’s own account, with a one-click reply page. No new tool for the people who only answer twice a year.

OUTBOUND

You stay the sender

Nothing goes to your buyer from Stazion. Fill in their own spreadsheet or form here, then send the bid from your own mailbox, as you always have.

RESIDENCY

EU data, isolated per org

Built in Denmark for European industry. Data stays in the EU, encrypted, with every organization fully isolated from every other.

INPUT

Reads what buyers actually send

PDF (including scanned), Word, Excel, and PowerPoint. Non-English RFPs are detected and translated so your team works in one language.

§ 09After the deal
SHARED ENGINEER · CLIENT WORKSPACEGATED
What’s the recommended service interval for the DRV-550 under continuous operation?

Under continuous operation the DRV-550 requires a lubrication service every 8,000 hours and a full inspection at 20,000 hours. Both can be performed without removing the unit from the line.

DRV550_service_manual.pdf · p. 23
3 DOCUMENTS SHARED · 2 APPROVED ADDRESSES · 14 QUESTIONS THIS MONTH

Give every client their own engineer.

The questions don’t stop when the deal closes. Hand each client a private AI Sales Engineer, trained only on the documents that matter to them. They get instant technical answers long after handover, and you see exactly what they ask.

01

Trained on the documents you pick

Each client’s engineer sees only the manuals, datasheets, and specs you choose for them. Nothing else from your library.

02

Gated to the addresses you choose

Access is limited to the client email addresses you approve. No public link, no anonymous traffic.

03

You see every question

Every question and topic is visible per client, a live signal of what they’re evaluating, struggling with, or about to buy next.

Explore the Shared Sales Engineer →
§ 10Questions

Asked before signing.

The questions every bid team asks in the first call.

Something else? Write us →

Stazion is the AI Sales Engineering Platform for companies that sell technical products and solutions, from manufacturers and distributors to integrators and contractors. First, it takes an incoming RFP, RFQ, or RFI and breaks it into every requirement, grouped under the team in your organization that answers it, with what you committed to on past tenders attached to each one. Your team writes the response; where the product comes off a datasheet, Stazion drafts and judges it too. Second, it answers technical product questions in plain language, instantly, with sources, so salespeople don’t have to wait on engineering.

§ 11 · Next RFP

Start with your
next RFP.

Upload your product documents in the morning. Answer your first RFP the same day, with every requirement drafted, cited, and ready to edit.

SAME-DAY SETUP · NO CONSULTANTS · NO IT PROJECT